All prices Ex-Works Furukawa regional warehouse · lead time in business days. Serial-matched kits for hydraulic breakers, rotary drilling masts and DTH consumables ship from the nearest hub with published MOQ guidance.
Use this counter-style list when your planner needs SKU families, not marketing copy. Lead times assume standard freight from the covering regional warehouse; expedited air is available for contracted MTTR sites once the serial and hour-meter screenshot are attached to the ticket.
| Group | SKU family | Typical lead time | MOQ |
|---|---|---|---|
| Undercarriage | Track shoes / sprockets / idlers / rollers for breaker carriers | 5 d | 1 set |
| Hydraulic | Breaker seal kit / accumulator bladder / control-valve seal | 7 d | 1 kit |
| Drilling Consumables | DTH bit / button bit / shank adapter / rod coupling | 8 d | 1 kit |
| Drifter Rebuild | Piston / bushing / chuck / front head rebuild package | 10 d | 1 kit |
| Piling Wear | Kelly bar wear pads / rotary table seals / casing shoe | 12 d | 1 set |
| Field Service | PM-250 / PM-500 / 1000h major / 8000h rebuild | 3 d | 1 kit |
Hydraulic cleanliness samples (ISO 4406) and rotary drilling torque logs accelerate kit selection — attach both files when emailing the parts counter so application engineers skip a clarification round. When a foundation mast reports elevated pilot pressure or a quarry breaker shows uneven impact energy, the same ticket thread can request a PM-500 inspection kit alongside consumables so the field engineer arrives with both diagnostic and repair SKUs.
Furukawa parts planners match carrier serial ranges before releasing breaker seal kits or drifter rebuild packages. That step prevents pin-diameter mismatches on excavator attachments and keeps rotary table seals aligned with the mast generation on site. If your fleet mixes older and newer DTH strings, list rod diameters and chuck types in the first email — the counter will split the order into stocked button bits versus made-to-order shank adapters rather than delaying the entire shipment.
Contract sites with published MTTR targets receive priority picking from the covering regional warehouse. Non-contract orders still ship, but planners schedule them after same-day breaker and drill emergencies clear the queue. For 8000-hour rebuild packages, expect a short engineering review of hour-meter screenshots and the last ISO 4406 sample so bushing clearance and oil cleanliness inform which pistons and front heads leave the rebuild cell.
Quote packs return in four business hours for stocked drilling and breaker SKUs. For complex rebuilds, include hour-meter and last ISO 4406 sample.